Bunyan

For engineering offices and fire-protection contractors

Fire-protection design review, checked against Saudi codes by AI.

Bunyan reads the RFQ, specifications and drawings, builds a register of every requirement, and flags each gap against SBC 801, NFPA and SEC standards, citing the exact sheet and clause. Your engineers stay in charge of every decision.

Review findings

132kV substation · Fire protection package

3 open
  • FA-104
    Fire alarmHigh

    Battery room has heat detection only; the project specification asks for smoke and hydrogen detection.

    PTS 4.10 · NFPA 72

  • CA-201
    Clean agentMedium

    Agent quantity uses a room height that does not match the architectural section. Recalculate.

    NFPA 2001 · A-301

  • BOQ 3.12
    QuantitiesCheck

    12 manual call points in the BOQ, 10 on the layout. Quantity not traceable to a drawing.

    BOQ ↔ FA-101

Illustrative example

The problem

Reviewing a fire-protection package is slow, manual and easy to get wrong.

Specifications run to thousands of pages

A single substation technical specification can exceed 2,700 pages, with the fire-protection scope buried in one section and its appendices.

Several code families overlap

SBC 801, Civil Defense, NFPA, SEC TES and TMSS, and HCIS each apply in different ways, and the adopted edition must be confirmed for every project.

Every revision starts over

Each consultant comment and drawing revision means rechecking layouts, calculations and quantities by hand, and keeping the BOQ in step.

How it works

From the client package to a cited review in four steps.

  1. 1

    Upload the package

    RFQ, technical specification, architectural and equipment drawings (PDF or DWG), calculations and the BOQ.

  2. 2

    Build the requirement register

    Every requirement is extracted with its source document, revision, page and clause, and the applicable codes are listed for confirmation.

  3. 3

    Check the design

    Layouts, calculations and quantities are checked against the register and the codes. Each finding has a severity and a citation.

  4. 4

    Engineer review and export

    Your engineer accepts or rejects each finding, then exports a comment sheet, marked-up PDFs and a BOQ traced back to the drawings.

Coverage

The systems a fire-protection package actually contains.

Built around substations, plants and industrial facilities, where most of the review effort goes.

Fire alarm and detection
Detector types and spacing, loops, notification, gas detection, cause and effect.
Clean agent suppression
FM-200 and Novec 1230: room volumes, concentration, agent quantity, reserve and enclosure integrity.
Sprinklers and hydrants
Hazard classification, head layout, design area and hydraulic demand.
Fire pumps and water storage
Pump duty, jockey pump, tank volume and duration against the water supply data.
Portable extinguishers
Type, rating and travel distance for each room and hazard.
Interfaces
HVAC shutdown, dampers, SCADA and SAS signals, and power supply boundaries.

Codes and standards

Checked against the references Saudi projects are approved on.

Bunyan keeps a controlled library of codes and client standards, and records which edition governs each project.

Saudi Building Code

Saudi Fire Code and Civil Defense requirements

  • SBC 801
  • Civil Defense

NFPA

System design, installation and testing

  • NFPA 72
  • NFPA 13
  • NFPA 20
  • NFPA 2001
  • NFPA 10

Saudi Electricity

Client standards for substations and transmission

  • SEC TES
  • TMSS
  • PTS

Industrial security

Requirements for facilities under HCIS

  • HCIS SAF

When a clause cannot be found in the library, Bunyan says so instead of guessing.

Principles

An assistant for engineers, not a replacement for them.

The engineer signs off

Nothing leaves the office without an engineer's approval at each stage gate.

Every finding is cited

Each comment links to the sheet, page and clause it is based on, so it can be checked in seconds.

No invented clauses

Assumptions and missing inputs are listed as open items, never presented as code requirements.

Data stays in the Kingdom

Project documents are processed and stored in Saudi Arabia.

Pilot Bunyan on your next project.

Send us a recent fire-protection package and we will return a cited review for your team to compare with its own.

Request a demo